TotalEnergies’ Namibia project delayed, scaled down

TotalEnergies, a French oil major, plans to make a final investment decision (FID) regarding its offshore oil discovery in Namibia in 2026, according to CEO Patrick Pouyanne. He announced this during a press briefing on Wednesday. 

The expected development will have a production capacity of 150,000 barrels per day. This figure is lower than the 160,000 barrels per day discussed during an investor day in October.

Previously, Pouyanne aimed for a FID decision by the end of 2025 during a results call last April.

The company faces challenges in achieving breakeven costs of under $20 per barrel, which is a prerequisite for the FID. 

Although Namibia has promising offshore discoveries, the lack of existing oil and gas production complicates development due to a high amount of gas that increases costs.

Recent updates revealed that BP wrote down its Namibian discoveries last month. Meanwhile, Chevron declared its initial findings to be commercially unviable.

Click here for more Business news.

Category
Lorem ipsum dolor sit amet, consectetur adipiscing elit eiusmod tempor ncididunt ut labore et dolore magna
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore